Region |
Project name |
Number of productions |
Total annual capacity |
Limits of allocated loans |
|
|
1. |
Republic of |
Total: |
8 |
|
38.5 |
|
Organization of production of wood chipboards (WCB) from cotton stems, reeds, straw, etc. |
3 |
180 thousand cubic meters |
20.0 |
||
|
Organization of production of aerated concrete blocks |
1 |
100 thousand cubic meters |
6.0 |
||
|
Organization of vermiculite production |
1 |
10 thousand tons |
6.0 |
||
|
Organization of talc processing for paint and varnish and ceramic production |
1 |
10 thousand tons |
2.0 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
1 |
5 thousand cubic meters |
2.5 |
||
|
Organization of production of dry mixes |
1 |
100 thousand tons |
2.0 |
||
|
2. |
Andijan |
Total: |
5 |
|
24.5 |
|
Organization of production of composite pipes and materials |
1 |
200 tons |
5.0 |
||
|
Organization of production of artificial facing slabs |
1 |
1 million sq. m |
3.0 |
||
|
Organization of production of paints and varnishes |
1 |
150 tons |
2.5 |
||
|
Organization of production of aerated concrete blocks |
1 |
200 thousand cubic meters |
12.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
2.0 thousand tons |
2.0 |
||
|
3. |
Bukhara |
Total: |
10 |
|
51.0 |
|
Organization of production of paints and varnishes |
1 |
200 tons |
3.5 |
||
|
Organization of production of aerated concrete blocks |
1 |
200 thousand cubic meters |
12.0 |
||
|
Organization of production of dry mixes |
1 |
200 thousand tons |
4.0 |
||
|
Organization of production of mixers |
1 |
24 thousand pieces |
2.0 |
||
|
Organization of production of graphite products |
1 |
10 tons |
2.0 |
||
|
Organization of production of sanitary ware |
1 |
200 thousand pieces |
10.0 |
||
|
Organization of plasterboard production |
1 |
12 million sq. m |
5.0 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
1 |
5 thousand cubic meters |
2.5 |
||
|
Organization of production of paper from natural stone |
1 |
800 thousand tons |
5.0 |
||
|
Organization of production of wood chipboards (WCB) from cotton stems, reeds, straw, etc. |
1 |
50 thousand cubic meters |
5.0 |
||
|
4. |
Jizzakh |
Total: |
7 |
|
39.0 |
|
Organization of production of materials based on basalt |
1 |
2.0 thousand tons |
15.0 |
||
|
Organization of production of composite pipes and materials |
1 |
200 tons |
5.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
4.0 thousand tons |
4.0 |
||
|
Organization of production of artificial facing slabs |
1 |
1.0 million sq. m |
2.0 |
||
|
Organization of production of aerated concrete blocks |
1 |
100 thousand cubic meters |
6.0 |
||
|
Organization of production of mineral wool and slabs |
1 |
400 tons |
2.0 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
1 |
10 thousand cubic meters |
5.0 |
||
|
5. |
Kashkadarya |
Total: |
5 |
|
23.5 |
|
Organization of production of aerated concrete blocks |
1 |
100 thousand cubic meters |
6.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
Organization of production of paints and varnishes |
1 |
300 tons |
5.0 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
1 |
5 thousand cubic meters |
2.5 |
||
|
Organization of microcalcite production |
1 |
200 thousand tons |
5.0 |
||
|
6. |
Navoi |
Total: |
9 |
|
37.5 |
|
Organization of production of paints and varnishes |
1 |
300 tons |
5.0 |
||
|
Organization of production of aerated concrete blocks |
1 |
100 thousand cubic meters |
6.0 |
||
|
Organization of vermiculite production |
1 |
10 thousand tons |
6.0 |
||
|
Organization of production of artificial facing slabs |
1 |
1.2 million sq. m |
3.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
Organization of MDF board production |
1 |
15 thousand cubic meters |
3.5 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
2 |
10 thousand cubic meters |
4.0 |
||
|
Organization of production of sanitary ware |
1 |
150 thousand pieces. |
5.0 |
||
|
7. |
Namangan |
Total: |
7 |
|
25.0 |
|
Organization of production of aerated concrete blocks |
1 |
200 thousand cubic meters |
6.0 |
||
|
Organization of production of sanitary ware |
1 |
150 thousand pieces. |
5.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
Organization of sulfur concrete production |
1 |
30 thousand cubic meters |
2.0 |
||
|
Organization of production of dry mixes |
1 |
100 thousand tons |
2.0 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
2 |
10 thousand cubic meters |
5.0 |
||
|
8. |
Samarkand |
Total: |
7 |
|
37.0 |
|
Organization of production of aerated concrete blocks |
1 |
200 thousand cubic meters |
12.0 |
||
|
Organization of production of dry mixes |
1 |
100 thousand tons |
2.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
Organization of production of paints and varnishes |
1 |
450 tons |
7.0 |
||
|
Organization of production of sanitary ware |
1 |
200 thousand pieces |
6.0 |
||
|
Extraction and processing of natural facing stones (blocks, slabs) |
2 |
10 thousand cubic meters |
5.0 |
||
|
9. |
Syrdarya |
Total: |
5 |
|
23.0 |
|
Organization of production of aerated concrete blocks |
1 |
100 thousand cubic meters |
6.0 |
||
|
Organization of production of paints and varnishes |
1 |
400 tons |
7.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
Organization of production of artificial facing slabs |
1 |
1.2 million sq. m |
3.0 |
||
|
Organization of production of dry mixes |
1 |
100 thousand tons |
2.0 |
||
|
10. |
Surkhandarya |
Total: |
6 |
|
34.5 |
|
Organization of production of aerated concrete blocks |
2 |
200 thousand cubic meters |
12.0 |
||
|
Organization of production of wood chipboards (WCB) from cotton stems, reeds, straw, etc. |
1 |
150 thousand cubic meters |
7.0 |
||
|
Organization of production of dry mixes |
1 |
50 thousand tons |
1.5 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
4 thousand tons |
4.0 |
||
|
Organization of production of gypsum and gypsum products |
1 |
100 thousand tons |
10.0 |
||
|
11. |
Tashkent |
Total: |
11 |
|
52.5 |
|
Organization of production of refractory bricks |
1 |
10 thousand tons |
3.0 |
||
|
Organization of production of roofing materials |
1 |
4 million sq. m |
5.0 |
||
|
Organization of production of mineral wool and slabs |
1 |
500 tons |
3.0 |
||
|
Organization of production of sanitary ware |
1 |
150 thousand pieces |
5.0 |
||
|
Organization of parquet and laminate production |
1 |
1.5 million sq. m |
1.5 |
||
|
Organization of production of aerated concrete blocks based on ash and quartz sand |
2 |
400 thousand cubic meters |
20.0 |
||
|
Organization of production of composite pipes and materials |
1 |
200 tons |
5.0 |
||
|
Organization of production of dry mixes |
1 |
100 thousand tons |
2.0 |
||
|
Organization of plasterboard production |
1 |
5 million sq. m |
3.0 |
||
|
Organization of production of ceramic blocks |
1 |
2.0 million pcs. |
5.0 |
||
|
12. |
Fergana |
Total: |
12 |
|
65.0 |
|
Organization of production of wood chipboards (WCB) from cotton stems, reeds, straw, etc. |
1 |
10 thousand cubic meters |
1.5 |
||
|
Organization of production of paints and varnishes |
1 |
100 tons |
2.5 |
||
|
Organization of production of refractory bricks |
1 |
10 thousand tons |
3.0 |
||
|
Organization of production of ceramic friezes |
1 |
1.5 million sq. m |
10.5 |
||
|
Organization of production of aerated concrete blocks |
1 |
200 thousand cubic meters |
12.0 |
||
|
Organization of production of composite pipes and materials |
1 |
200 tons |
5.0 |
||
|
Organization of porcelain stoneware production |
1 |
2.7 million sq. m |
12.0 |
||
|
Organization of production of dry mixes |
1 |
40 thousand tons |
1.5 |
||
|
Organization of production of sanitary ware |
1 |
150 thousand pieces. |
5.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
Organization of production of mixers |
1 |
24 thousand pieces. |
2.0 |
||
|
Organization of production of ceramic blocks |
1 |
2.0 million pcs. |
5.0 |
||
|
13. |
Khorezm |
Total: |
6 |
|
23.0 |
|
Organization of production of paints and varnishes |
1 |
100 tons |
2.5 |
||
|
Organization of production of abrasive discs |
1 |
100 thousand pieces |
1.5 |
||
|
Organization of production of aerated concrete blocks |
1 |
100 thousand cubic meters. |
6.0 |
||
|
Organization of production of dry mixes |
1 |
36 thousand tons |
1.0 |
||
|
Organization of wallpaper production |
1 |
2.5 million rolls |
7.0 |
||
|
Organization of production of pipes, fittings, panels, floor coverings made of polyvinyl chloride (PVC) |
1 |
5 thousand tons |
5.0 |
||
|
14. |
Tashkent city |
Total: |
6 |
|
26.0 |
|
Organization of production of paints and varnishes |
1 |
100 tons |
2.5 |
||
|
Organization of wallpaper production |
1 |
2.5 million rolls |
7.0 |
||
|
Organization of linoleum production |
1 |
2.5 million sq. m |
7.0 |
||
|
Organization of parquet and laminate production |
1 |
1.5 million sq. m |
1.5 |
||
|
Organization of production of composite pipes and materials |
1 |
200 tons |
5.0 |
||
|
Organization of production of artificial facing slabs |
1 |
1.2 million sq. m |
3.0 |
||
|
Total |
|
104 |
|
500,0 |
|
|
Events |
Date |
Organization of control over the progress of execution |
|||
|
beginning |
endings |
responsible |
review period |
||
|
I. Expansion of the local raw material base for the production of building materials |
|||||
|
1 . |
Increasing geological exploration work to identify new deposits of non-metallic minerals used in the production of building materials. Responsible: State Committee on Geology (B. Islomov) |
|
|
Cabinet of Ministers (A. Aripov) |
monthly |
|
1.1 |
Ensuring the accelerated completion of geological exploration work on 10 non-metallic mineral deposits and, based on the results, submitting a report for approval to the State Commission on Mineral Reserves. Responsible: State Committee on Geology (B. Islomov) |
June 2019 |
november 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
December 2019 |
|
1.2 |
Preparation and submission to the Cabinet of Ministers of the Republic of Uzbekistan of a draft State Program for the Development and Reproduction of the Mineral Resource Base for 2020-2021, with an increase in the number of projects to identify new deposits of non-metallic minerals in demand in the production of building materials. Responsible: State Committee on Geology (B. Islomov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
november 2019 |
Cabinet of Ministers (A. Aripov) |
December 2019 |
|
2. |
Taking measures to develop deposits of non-metallic minerals and attract potential investors to their industrial development. Responsible: State Committee on Geology (B. Islomov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
2.1 |
Inventory of non-metallic mineral deposits for the purposes of industrial development. Responsible: State Committee for Geology (B. Islomov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
2.2 |
Preparation of a list of undeveloped non-metallic minerals by region of the republic, used for the production of building materials, indicating reserves and chemical composition. Responsible: State Committee on Geology (B. Islomov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
2.3 |
Ensuring broad awareness among local and foreign investors of the available opportunities and potential for the production of building materials based on local raw materials. Responsible: State Committee for Geology (B. Islomov), Ministry of Economic Industry (U. Salimov), Association “Uzpromstroymaterialy” (B. Zaripov), Council of Ministers of the Republic of |
May 2019 |
July 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
July 2019 |
|
2.4 |
Attracting potential investors to industrial development of non-metallic mineral deposits. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Ministry of Economy and Industry (U. Salimov), State Committee on Geology (B. Islomov), Association "Uzpromstroymaterialy" |
May 2019 |
July 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
July 2019 |
|
3 . |
Ensuring rational use of local mineral resources used in the production of building materials. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
3.1 |
Creation of a permanent working group to study the targeted and rational use of subsoil resources. Responsible: Ministry of Economy and Industry (U. Salimov), State Committee on Geology (B. Islomov) |
May 2019 |
June 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
June 2019 |
|
3.2 |
Conducting monitoring to identify violations of licensing requirements and failure to meet production volumes of non-metallic minerals by subsoil users. Responsible: State Committee for Geology (B. Islomov), Association "Uzpromstroymaterialy" |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July |
|
3.3 |
A decision in accordance with the established procedure on the issue of early termination of licenses and the transfer of the right to use a subsoil plot to other potential investors. Responsible: State Committee on Geology (B. Islomov) |
as identified |
as identified |
Cabinet of Ministers (A. Aripov) |
July |
|
II. Optimization of imports, expansion of localization and increase of export potential |
|||||
|
4. |
Study of the production potential of construction materials enterprises, analysis of existing problems and barriers. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
november 2019 |
|
4.1 |
Conducting an in-depth analysis of the activities of building materials manufacturers on the subject of: - efficiency of use and modernization of production capacities; - compliance with modern requirements of existing and planned production technologies. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
June 2019 |
October 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
October 2019 |
|
4.2 |
Development and approval of regulations for manufactured building materials. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
October 2019 |
november 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
november 2019 |
|
5. |
Production of building materials aimed at reducing imports and meeting the domestic needs of the republic. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
5.1 |
Conducting an in-depth analysis of the volumes, structure and range of imported products. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
June 2019 |
June 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
June 2019 |
|
5.2 |
Increase in production capacity for aerated concrete, composite materials, fiberglass, basalt fiber, dry building mixes and facing stones. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
July 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
5.3 |
Development of an annual plan of practical measures to reduce imports of those types of building materials whose production has been mastered in the country. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
August 2019 |
August 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
5.4 |
Creation of an investment company within the structure of the Uzpromstroymaterialy Association for the broad attraction of potential investors, including foreign ones, to the industry, with subsequent implementation of joint production of in-demand types of building materials. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
June 2019 |
August 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
6. |
Study of the progress of implementation of investment projects for the production of building materials in the regions of the country. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Investment and Foreign Trade (S. Umurzakov) |
August 2019 |
|
6.1 |
Study of the progress of investment projects implementation with on-site visits. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Ministry of Economic Industry (U. Salimov), Association “Uzpromstroymaterialy” (B. Zaripov), Council of Ministers of the Republic of |
on an ongoing basis |
on an ongoing basis |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
6.2 |
Taking measures to solve existing problems and eliminate shortcomings that hinder the effective and timely implementation of investment projects. Responsible: Ministry of Economic Industry (U. Salimov), Association “Uzpromstroymaterialy” (B. Zaripov), Council of Ministers of the Republic of Karakalpakstan, regional khokimiyats and |
on an ongoing basis |
on an ongoing basis |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
August 2019 |
|
7. |
Increasing competitiveness, production volumes and exports of key types of building materials. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Investment and Foreign Trade (S. Umurzakov) |
August 2019 |
|
7.1 |
Study of the situation in the domestic and foreign markets of construction materials and development trends in foreign countries, including with the assistance of the embassies of the Republic of Uzbekistan abroad. Responsible: Ministry of Economic Industry (U. Salimov), Ministry of Investment and Foreign Trade (S. Umurzakov), Ministry of Foreign Affairs (A. Kamilov), Association “Uzpromstroymaterialy” (B. Zaripov) |
June 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
7.2 |
Development and submission to the Cabinet of Ministers of proposals for organizing the production of new types of building materials. Responsible: Ministry of Economic Industry (U. Salimov), Association “Uzpromstroymaterialy” |
July 2019 |
August 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
7.3 |
Holding an international exhibition of modern equipment, technologies and materials for the construction industry - "Uzbuild-2020" with an invitation to potential foreign buyers and investors. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Ministry of Economic Industry (U. Salimov), Association “Uzpromstroymaterialy” (B. Zaripov), Council of Ministers of the Republic of |
February 2020 |
March 2020 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
March 2020 |
|
8. |
Improving the image of national building materials in world markets. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov) |
|
|
Ministry of Investment and Foreign Trade (S. Umurzakov) |
December 2019 |
|
8.1 |
Conducting negotiations to attract well-known global manufacturers of building materials, including under a franchise agreement. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Association “Uzpromstroymaterialy” |
June 2019 |
December 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
December 2019 |
|
8.2 |
Promotion of products of national manufacturers of building materials abroad, including by assisting in the participation of local enterprises producing building materials in international specialized exhibitions of building materials and foreign tenders. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Ministry of Foreign Affairs (A. Kamilov), Association “Uzpromstroymaterialy” (B. Zaripov), Council of Ministers of the Republic of |
June 2019 |
December 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
December 2019 |
|
9. |
Wide dissemination of information and analytical materials and provision of consulting services through an industry web portal. Responsible: Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (U. Salimov) |
December 2019 |
|
9.1 |
Posting on the website of the Association "Uzpromstroymaterialy" information about manufactured, exported, imported and localized products, as well as information and analytical materials on the development of the industry, methodological manuals on the organization and management of enterprises in the industry, the production of building materials and obtaining the necessary permits. Responsible: Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (U. Salimov) |
on an ongoing basis |
|
10. |
Conducting an analysis of the cost of construction materials and making proposals for their reduction. Responsible: Antimonopoly Committee (N. Sharipov), Ministry of Economy |
June 2019 |
December 2019 |
Cabinet of Ministers (D. Kuchkarov) |
December 2019 |
|
10.1 |
Organization of cost analysis of building materials. Responsible: Antimonopoly Committee (N. Sharipov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Cabinet of Ministers (D. Kuchkarov) |
on an ongoing basis |
|
10.2 |
Preventing artificial inflated costs of building materials by analyzing the activities of raw material producers. Responsible: Antimonopoly Committee (N. Sharipov), Ministry of Economy and Industry |
June 2019 |
December 2019 |
Cabinet of Ministers (D. Kuchkarov) |
on an ongoing basis |
|
11. |
Ensuring the sale of building materials on electronic trading platforms. Responsible: Ministry of Economy and Industry (U. Salimov) |
August 2019 |
October 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
October 2019 |
|
11.1 |
Development of an online database of domestic manufacturers of building materials. Responsible: Ministry of Finance (Sh. Sadikov), Association "Uzpromstroymaterialy" (B. Zaripov), State Statistics Committee (B. Begalov) |
June 2019 |
August 2019 |
Mininfokom (Sh. Sadikov) |
August 2019 |
|
11.2 |
Organization of electronic trading platforms in each region of the country in order to expand the geography of exports of construction materials, primarily to the border regions of neighboring states. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Association “Uzpromstroymaterialy” |
July 2019 |
August 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
August 2019 |
|
11.3 |
Ensuring cooperation and integration of national electronic trading platforms with commodity exchanges and platforms of foreign countries. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Foreign Affairs (A. Kamilov), Association "Uzpromstroymaterialy" |
June 2019 |
December 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
on an ongoing basis |
|
III. Implementation of innovations and international standards in the production of building materials |
|||||
|
12. |
Organization of production of new types of innovative building materials. Responsible: Ministry of Innovations (I. Abdurakhmanov) |
|
|
Mini-Innovations (I. Abdurakhmanov) |
December 2019 |
|
12.1 |
Study of advanced international experience in the implementation of innovations in the building materials industry. Responsible: Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" |
June 2019 |
December 2019 |
Mini-Innovations |
on an ongoing basis |
|
12.2 |
Implementation of scientific achievements into production processes. Responsible: Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" |
June 2019 |
December 2019 |
Mini-Innovations (I. Abdurakhmanov) |
on an ongoing basis |
|
12.3 |
Development and implementation of technologies for processing and using secondary raw materials. Responsible: Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" |
June 2019 |
December 2019 |
Mini-Innovations (I. Abdurakhmanov) |
on an ongoing basis |
|
12.4 |
Implementation of new technologies for the production of gypsum composite materials. Responsible: Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" |
June 2019 |
December 2019 |
Mini-Innovations (I. Abdurakhmanov) |
on an ongoing basis |
|
13. |
Harmonization of national standards in the field of building materials and construction industry with international standards, including taking into account the use of new types of building materials. Answer: Uzstandard Agency (D. Sattarov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
October 2019 |
|
13.1 |
Study of international standards in the field of production of building materials. Responsible: Uzstandard Agency (D. Sattarov), Ministry of Construction (Sh. Khashimov), Uzpromstroymaterialy Association (B. Zaripov) |
June 2019 |
August 2019 |
Uzstandard Agency (D. Sattarov) |
August 2019 |
|
13.2 |
Submitting proposals for amendments and additions to current standards. Responsible: Uzstandard Agency (D. Sattarov), Ministry of Construction (Sh. Khashimov), Uzpromstroymaterialy Association (B. Zaripov) |
September 2019 |
October 2019 |
Uzstandard Agency (D. Sattarov) |
October 2019 |
|
14. |
Implementation of advanced experience in technical regulation in the field of construction, as well as innovative energy-efficient and import-substituting building materials and technologies, including by organizing regular visits of specialists to study the experience of developed countries in matters of implementing modern construction and design technologies, as well as innovative development of the building materials industry. Responsible: Ministry of Construction (Sh. Khashimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
December 2019 |
|
14.1 |
Conducting a comprehensive inventory of the current regulatory framework for technical regulation in the field of construction. Responsible: Ministry of Construction (Sh. Khashimov), Uzstandard Agency (D. Sattarov), Uzpromstroymaterialy Association (B. Zaripov) |
June 2019 |
August 2019 |
Ministry of Construction (Sh. Khashimov) |
August 2019 |
|
14.2 |
Submitting proposals for the widespread introduction of innovative energy-efficient, energy-saving and import-substituting building materials and technologies. Responsible: Ministry of Innovations (I. Abdurakhmanov), Ministry of Construction (Sh. Khashimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
September 2019 |
October 2019 |
Mini-Innovations (I. Abdurakhmanov) |
October 2019 |
|
14.3 |
A comprehensive study of foreign experience in technical regulation in the field of construction, as well as innovative development of the building materials industry. Responsible: Ministry of Construction (Sh. Khashimov), Uzstandard Agency (D. Sattarov), Uzpromstroymaterialy Association (B. Zaripov) |
June 2019 |
August 2019 |
Ministry of Construction (Sh. Khashimov) |
August, 2019 |
|
14.4 |
Transformation of regional testing and certification centers into regional branches with the transfer of their laboratories in the areas of measurements to the State Unitary Enterprise “Uzbek National Institute of Metrology” and assessment of conformity of products and services to the State Unitary Enterprise “Republican Center for Testing and Certification”. Answer: Uzstandard Agency (D. Sattarov) |
September 2019 |
november 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
november 2019 |
|
14.5 |
Modernization of the testing base and improvement of the efficiency of regional branches of the State Unitary Enterprise “Uzbek National Institute of Metrology” and the State Unitary Enterprise “Republican Center for Testing and Certification”. Answer: Uzstandard Agency (D. Sattarov) |
november 2019 |
March 2020 |
Ministry of Economy and Industry (B. Khodjaev) |
March |
|
IV. Uninterrupted supply of fuel and energy resources to enterprises, introduction of modern resource-saving technologies into the production process |
|||||
|
15. |
Uninterrupted supply of fuel and energy resources to industry enterprises. Responsible: Ministry of Energy (A. Sultanov) |
|
|
Ministry of Energy (A. Sultanov) |
on an ongoing basis |
|
15.1 |
Conducting a comprehensive inventory of the state of provision of enterprises in the industry with fuel and energy resources, as well as the availability of the necessary infrastructure in the regions of the country. Responsible: Ministry of Energy (A. Sultanov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Energy |
December 2019 |
|
15.2 |
Uninterrupted supply of fuel and energy resources to enterprises in the industry by introducing additional capacities, Responsible: Ministry of Energy (A. Sultanov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Energy (A. Sultanov) |
December 2019 |
|
16. |
Reducing energy intensity at existing construction materials production facilities. Responsible: Ministry of Energy (A. Sultanov) |
|
|
Ministry of Energy |
on an ongoing basis |
|
16.1 |
Introduction of modern resource-saving technologies into the production process, allowing for energy efficiency and increased productivity of enterprises. Responsible: Ministry of Energy (A. Sultanov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Energy |
December 2019 |
|
16.2 |
Providing assistance in attracting foreign investment and preferential loans from commercial banks to finance projects to convert the production process to energy-saving technologies. Responsible: Ministry of Investment and Foreign Trade (S. Umurzakov), Ministry of Economy and Industry |
June 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
on an ongoing basis |
|
17. |
Gradual transition to the use of coal (instead of natural gas) by manufacturers of building materials and greenhouse complexes. Responsible: Ministry of Energy (A. Sultanov) |
|
|
Ministry of Energy |
quarterly |
|
17.1 |
Approval of a set of measures for the gradual transition of cement producers, brick factories, and slaked lime production plants to the use of coal and other types of fuel alternative to natural gas, providing for government support measures. Responsible: Ministry of Energy (A. Sultanov) |
June 2019 |
July 2019 |
Ministry of Energy |
July 2019 |
|
17.2 |
Development and approval of coefficients, standards and criteria classifying equipment and technologies that meet energy efficiency criteria. Responsible: Ministry of Energy (A. Sultanov), Uzstandard Agency (D. Sattarov), Ministry of Construction (Sh. Khashimov), Uzpromstroymaterialy Association |
June 2019 |
August 2019 |
Ministry of Energy |
August 2019 |
|
17.3 |
Conducting an inventory and approving a list of enterprises whose specific natural gas consumption standards meet the criteria of energy-saving technologies. Responsible: Ministry of Energy (A. Sultanov), Association "Uzpromstroymaterialy" (B. Zaripov) |
July 2019 |
november 2019 |
Ministry of Energy |
november 2019 |
|
V. Production of new types of building materials |
|||||
|
18. |
A gradual transition from the production of energy-intensive building materials to energy-efficient alternative types of products. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
December 2019 |
|
18.1 |
Conducting an analysis of the main building materials and preparing proposals for the production of energy-efficient types of alternative products. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
August 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
18.2 |
Conducting extensive explanatory work among manufacturing enterprises. Responsible: Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
on an ongoing basis |
|
19. |
Organization of clusters in the country's regions for the production of building materials based on polyvinyl chloride (PVC) granules. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
november 2019 |
|
19.1 |
Submission to the Cabinet of Ministers of the Republic of Uzbekistan of proposals on the organization of clusters in the regions of the country for the production of building materials based on polyvinyl chloride (PVC) granules, including providing for: - development of production of import-substituting building materials based on PVC granules, including profiles, composite materials, pipes, fittings, wall and decorative materials, linoleum and floor coverings, plumbing products; - wide involvement of foreign investors in the implementation of projects for the production of import-substituting building materials based on PVC granules; - placement of newly created enterprises for the production of import-substituting building materials based on PVC granules in free economic zones and ensuring their connection to the necessary infrastructure. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Investment and Foreign Trade |
October 2019 |
november 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
november 2019 |
|
20. |
Submission to the Cabinet of Ministers of the Republic of Uzbekistan of proposals on the organization of stone paper production in the country. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
20.1 |
Study of foreign experience and technological processes for the production of paper from stone, attraction of foreign investors and specialists to organize production in the country. Responsible: Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
20.2 |
Taking measures to identify deposits of non-metallic minerals necessary for the production of paper from stone and to allocate them to potential investors for industrial development and implementation of projects. Responsible: State Committee for Geology (B. Islomov), Uzpromstroymaterialy Association ( B. Zaripov |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
20.3 |
Study of needs and provision of necessary chemical raw materials for stone paper producers. Responsible: Ministry of Economy and Industry (U. Salimov), JSC Uzbekneftegaz (B. Siddikov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
20.4 |
Study of the compliance of paper produced from stone with domestic standards and regulatory documents and, if necessary, making changes and additions to them. Responsible: Uzstandard Agency (D. Sattarov), Uzpromstroymaterialy Association (B. Zaripov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
21. |
Organization of production of aerated concrete using the autoclave method. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
21.1 |
Development of proposals for the production of aerated concrete using the autoclave method. Responsible: Ministry of Economy and Industry (U. Salimov) |
May 2019 |
June 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
June 2019 |
|
21.2 |
Identification of potential investors for the implementation of projects for the production of aerated concrete using the autoclave method. Responsible: Ministry of Investment and Foreign Trade (S. Bekenov), Association "Uzpromstroymaterialy" |
June 2019 |
July 2019 |
Ministry of Investment and Foreign Trade (S. Umurzakov) |
July 2019 |
|
21.3 |
Study of the compliance of aerated concrete produced using the autoclave method with domestic standards and regulatory documents and, if necessary, making changes and additions to them. Responsible: Ministry of Construction (Sh. Khashimov), Uzstandard Agency (D. Sattarov), Ministry of Economy and Industry |
June 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
22. |
Widespread use of paulownia for the production of building materials, including through the expansion of paulownia plantations in the country's regions. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
22.1 |
Study of land plots suitable for growing paulownia. Responsible: Ministry of Economy and Industry (U. Salimov), State Forestry Committee (N. Bakirov), Association "Uzpromstroymaterialy" (B. Zaripov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
22.2 |
Import of paulownia seeds and seedlings suitable for the soil and climatic conditions of the country's regions. Responsible: Ministry of Economy and Industry (U. Salimov), State Forestry Committee (N. Bakirov), Association "Uzpromstroymaterialy" (B. Zaripov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
22.3 |
Study of the compliance of building materials made from paulownia with domestic standards and regulatory documents and, if necessary, making changes and additions to them. Responsible: Uzstandard Agency (D. Sattarov), Uzpromstroymaterialy Association (B. Zaripov) |
May 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
VI. Further development of scientific research, improvement of the system of training, retraining and advanced training of specialists |
|||||
|
23. |
Organization of research and development work to create new types of building materials, improve technological production processes and improve the quality of existing building materials. Responsible: Ministry of Innovations (I. Abdurakhmanov) |
|
|
Mini-Innovations (I. Abdurakhmanov) |
December 2019 |
|
23.1 |
Study of the state of industry research institutes and development of appropriate measures for their modernization. Responsible: Ministry of Innovations (I. Abdurakhmanov), Academy of Sciences (B. Yuldashev), Ministry of Higher Education |
May 2019 |
July 2019 |
Mini-Innovations (I. Abdurakhmanov) |
July 2019 |
|
23.2 |
Conducting an analysis of problems in the construction materials production industry and announcing current scientific and technical topics aimed at creating new types of construction materials, improving production processes and improving the quality of existing construction materials within the framework of the state scientific and technical program of the Republic of Uzbekistan. Responsible: Ministry of Innovations (I. Abdurakhmanov), Academy of Sciences (B. Yuldashev), Ministry of Higher Education |
May 2019 |
September 2019 |
Mini-Innovations (I. Abdurakhmanov) |
September 2019 |
|
23.3 |
Submitting proposals for the commercialization of research results. Responsible: Ministry of Innovations (I. Abdurakhmanov), Academy of Sciences (B. Yuldashev), Ministry of Higher Education |
May 2019 |
December 2019 |
Mini-Innovations (I. Abdurakhmanov) |
December 2019 |
|
24. |
Development of new curricula with in-depth specialization in popular areas of the building materials industry, providing for the training of students in close cooperation with manufacturing enterprises. Responsible: Ministry of Higher Education (I. Majidov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
24.1 |
Conducting an inventory of existing areas and specializations in training personnel in the field of the building materials industry in higher education institutions. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
May 2019 |
June 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
June 2019 |
|
24.2 |
Preparation and submission of proposals to the Cabinet of Ministers on new educational areas and specialties, as well as revision of admission quotas taking into account international experience and production needs. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
July 2019 |
|
25. |
Integration of enterprises producing building materials with educational institutions that train personnel in specialized fields. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
December 2019 |
|
25.1 |
Attachment of leading enterprises to specialized departments of the Fergana Polytechnic Institute, the Jizzakh Polytechnic Institute, and the Bukhara Engineering and Technological Institute to ensure integration in the “education-science-production” system. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Construction (Sh. Khashimov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
25.2 |
Development and joint approval of measures to expand the participation of manufacturing enterprises in improving the quality of education. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Construction (Sh. Khashimov), Ministry of Higher Education (I. Majidov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
July 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
25.3 |
Organization of industrial practice for university students and college students at industry enterprises to prepare future specialists for the real production process with the creation of conditions at workplaces and the appointment of mentors from among the employees of the enterprises. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Construction (Sh. Khashimov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
August 2019 |
on an ongoing basis |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
25.4 |
Creation of permanent accommodation for student interns (as part of a group, subgroup) at enterprises. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Construction (Sh. Khashimov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
October 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August, October 2019 |
|
26. |
Creation of conditions for higher educational institutions in industrial enterprises of the industry to conduct research work in the field of production of building materials. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
December 2019 |
|
26.1 |
Creation of conditions for relevant higher education institutions, scientists, doctoral students, and researchers to study the problems of enterprises and conduct scientific work to solve them. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Construction (Sh. Khashimov), Ministry of Economy and Industry (U. Salimov), Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
August 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
26.2 |
Provision of material and technical resources (including laboratories) to enterprises for research and development work free of charge. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Construction (Sh. Khashimov), Ministry of Higher Education (I. Majidov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
August 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August 2019 |
|
26.3 |
Creating conditions for the implementation of new scientific developments into production. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Construction (Sh. Khashimov), Ministry of Higher Education (I. Majidov), Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" (B. Zaripov) |
May 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August, October, December 2019 |
|
27. |
Equipping educational and laboratory classrooms of specialized faculties of the Fergana Polytechnic Institute, the Jizzakh Polytechnic Institute, and the Bukhara Engineering and Technological Institute with samples of new building materials and their raw materials, models of technological lines and structures. Responsible: Ministry of Economy and Industry (U. Salimov) |
|
|
Ministry of Economy and Industry (B. Khodjaev) |
December 2019 |
|
27.1 |
Allocation of classrooms in educational institutions for equipping as specialized teaching and laboratory classrooms. Responsible: Ministry of Higher Education (I. Majidov), Ministry of Construction (Sh. Khashimov), Ministry of Economy and Industry (U. Salimov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August, October, December 2019 |
|
27.2 |
Provision of samples of new building materials, models of technological lines, raw materials and products by enterprises producing building materials. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Construction (Sh. Khashimov), Ministry of Higher Education (I. Majidov), Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August, October, December 2019 |
|
27.3 |
Equipping specialized educational and laboratory classrooms with new samples of building materials. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Construction (Sh. Khashimov), Ministry of Higher Education (I. Majidov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August, October, December 2019 |
|
27.4 |
Organization, with the involvement of leading foreign companies, of centers for advanced training and skills in the application of advanced technologies used in the production of building materials. Responsible: Ministry of Economy and Industry (U. Salimov), Ministry of Innovations (I. Abdurakhmanov), Association "Uzpromstroymaterialy" (B. Zaripov) |
June 2019 |
December 2019 |
Ministry of Economy and Industry (B. Khodjaev) |
August, October, December 2019 |
|
Other uncoated paper and paperboard, in rolls or sheets, for the production of gypsum plasterboards |
||
|
Wood pulp for the production of paper products (cardboard, napkins) |
||
|
Object of standardization |
Quantity |
Index |
|
|
TOTAL |
1 387 |
|
|
|
in 2019 - 340 standards |
|||
|
1. |
Windows, doors and blinds (basic requirements for load, thermal conductivity, strength, exposure to climatic conditions, testing methods for determining quality indicators, including height, width, thickness and perpendicularity of sides) |
29 |
ISO 1804, ISO 6445, ISO 6442ISO 6443, ISO 6444, ISO 8271, ISO 6612, ISO 6613, ISO 8248, ISO 8274, ISO 8269, ISO 8270, ISO 8272, ISO 8273, ISO 8275, ISO 9380, ISO 9381, ISO 15821, ISO 10077-1, ISO 10077-2, ISO 12567-1, ISO 12567-2, ISO 15099, ISO 10077-1, ISO 10077-2, ISO 10211, ISO 12567-1, ISO 12567-2, ISO 12569 |
|
2. |
Construction connections (fundamental terms for international construction projects and development of the international construction materials market, basic principles of joint design, requirements for laboratory testing methods) |
4 |
ISO 2444, ISO 2445, ISO 3447, ISO 6589 |
|
3. |
Building structures (methods of testing seismic impact on structures, determining loads, calculating building deformations, reliability) |
8 |
ISO 3010, ISO 3898, ISO 4354, ISO 4355, ISO 4356, ISO 6243, ISO 8930, ISO 9194 |
|
4. |
Fundamentals of structural calculations (operational reliability of buildings under conditions of vibration, loads from bulk materials) |
2 |
ISO 10137, ISO 11697 |
|
5. |
Steel structures (materials and design solutions, manufacturing and assembly) |
2 |
ISO 10721-1, ISO 10721-2 |
|
6. |
Timber structures (glued laminated timber, methods for determining the shear strength of adhesive joints) |
2 |
ISO 12579, ISO 12580 |
|
7. |
Stone masonry (test methods, calculation of unreinforced masonry using simple rules) |
3 |
ISO 9652-2, ISO 9652-4, ISO 9652-5 |
|
8. |
Wooden structures (determination of strength and deformation characteristics, physical and mechanical properties, fasteners and connections, impact loads, determination of holding capacity when extracting nails and bolts under axial load, testing for delamination of face and edge joints, structural properties of laminated lumber) |
34 |
ISO 6891, ISO 8375, ISO 8969, ISO 13910, ISO 15206, ISO 16507, ISO 16572, ISO 16598, ISO 16670, ISO 17754, ISO/TR 18267, ISO 8970, ISO 9087, ISO 10983, ISO 18324, ISO 18402, ISO 19049, ISO 19993, ISO 20152-1, ISO 20152-2, ISO/TR 20152-3, ISO/PRF TR 21136, ISO 21581, ISO 22389-1, ISO 22389-2, ISO 22452, ISO 10984-1, ISO 10984-2, ISO 12122-1, ISO 12122-2, ISO 12122-3, ISO 12122-4, ISO 12578, ISO 22390 |
|
9. |
Vertical joints (properties, characteristics and classification criteria, impact of tangential load) |
2 |
ISO 7729, ISO 10144 |
|
10. |
Concrete and concrete structures ( guidelines for repair of permeable cracks in concrete structures, strength of hardened concrete, preparation and curing of test specimens, properties of hardened concrete, non-destructive testing of hardened concrete ) |
20 |
ISO 13315-1, ISO 13315-2, ISO 14484, ISO 14654, ISO 14655, ISO 14656, ISO 14657, ISO 15673, ISO 16204, ISO/TR 16475, ISO/TS 16774-2, ISO/TS 16774-3, ISO/TS 16774-4, ISO/PRF TS 16774-5, ISO/PRF TS 16774-6, ISO 18319, ISO 19338, ISO 22966, ISO 7900, ISO 1716 |
|
11. |
Hydrothermal characteristics of building materials and products ( determination of moisture content by drying at elevated temperature, hygroscopic sorption properties, moisture absorption and release properties in response to changes in humidity ) |
4 |
ISO 12570, ISO 12571, ISO 15148, ISO 24353 |
|
12. |
Cement (strength determination, chemical analysis using X-ray fluorescence, determination of heat of hydration, testing of pozzolanic cements for hydraulicity) |
9 |
ISO 679, ISO 14824-1, ISO 14824-2, ISO 14824-3, ISO 29581-2, ISO 29582-1, ISO 863, ISO 9597, ISO/TR 12389 |
|
13. |
Composite cork (fillers for expansion joints) |
2 |
ISO 3867, ISO 3869 |
|
14. |
Vulcanized thermoplastic rubber (requirements and test methods) |
1 |
ISO 3934 |
|
15. |
Ceramic tiles (determination of small color differences, lead and cadmium content released by glazed tiles, classification, characteristics and marking, impact resistance by measuring the coefficient of recovery, resistance to deep abrasion of unglazed tiles) |
28 |
ISO 13007-3, ISO 13007-4, ISO 13007-5, ISO 10545-1, ISO 10545-2, ISO 10545-3, ISO 10545-4, ISO 10545-5, ISO 10545-6, ISO 10545-7, ISO 10545-8, ISO 10545-9, ISO 10545-10, ISO 10545-11, ISO 10545-12, ISO 10545-13, ISO 10545-14, ISO 10545-15, ISO 10545-16, ISO 13006, ISO 13007-1, ISO 13007-2, ISO 13007-3, ISO 13007-4, ISO 13007-5, ISO 14448, ISO/TR 17870-1, ISO/TR 17870-2 |
|
16. |
Concrete (epoxy coated steel for concrete reinforcement, epoxy foam and sealant for coating steel for concrete reinforcement, calculation of service life of concrete structures, guidelines for repairing water-permeable cracks in concrete structures, construction of concrete structures) |
25 |
ISO 1920-1, ISO 22965-1, ISO 22965-2, ISO 13315-1, ISO 13315-2, ISO 29581-1, ISO 1920-2, ISO 1920-3, ISO 1920-4,ISO 1920-5, ISO 1920-6, ISO 1920-7, ISO 1920-8, ISO 1920-9, ISO 1920-10, ISO 1920-11, ISO 1920-12, ISO 6274, ISO 6782, ISO 6783, ISO 7033, ISO 16311-1, ISO 16311-2, ISO 16311-3, ISO 16311-4 |
|
17. |
Thermal insulation products ( specifications for use with restricted ventilation, specifications for use in horizontal position with unlimited ventilation, determination of bending characteristics, determination of long-term changes in thermal resistance of closed-cell foams, accelerated laboratory test methods ) |
52 |
ISO 2219, ISO 8142, ISO 8144-1, ISO 8144-2, ISO 8145, ISO 9076-2, ISO 12344, ISO 11561, ISO 12576-1, ISO 12576-2, ISO 12623, ISO 12624, ISO 12628, ISO 12629, ISO 12968, ISO 13787, ISO 16534, ISO 16535, ISO 16536, ISO 16537, ISO 16544, ISO 16545, ISO 16546, ISO 18096, ISO 18097, ISO 18098, ISO 18099, ISO 23993, ISO 29465, ISO 29466, ISO 29467, ISO 29468, ISO 29469, ISO 29470, ISO 29471, ISO 29472, ISO 29764, ISO 29765, ISO 29766, ISO 29767, ISO 29768, ISO 29769, ISO 29770, ISO 29771, ISO 29803, ISO 29804, ISO 29805, ISO 6781, ISO 12574-2, ISO 12575-1, ISO 12575-2, ISO 9774 |
|
18. |
Agglomerated Cork Floor Tiles ( determination of dimensions and deviations from squareness and straightness of edges ) |
1 |
ISO 9366 |
|
19. |
Acoustics ( measurement of sound absorption in a reverberation chamber, insulation from airborne noise, insulation from impact |
43 |
ISO 354, ISO 717-1, ISO 717-2, ISO 3382-1, ISO 3382-2, ISO 3382-3, ISO 7235, ISO 9052-1, ISO 10052, ISO 10053, ISO 10140-1, ISO 10140-2, ISO 10140-3, ISO 10140-4, ISO 10140-5, ISO 10848-1, ISO 10848-2, ISO 10848-3, ISO 10848-4, ISO 11654, ISO 11691, ISO 11820, ISO 12999-1, ISO 15186-1, ISO 15186-2, ISO 15186-3, ISO 15665, ISO 15712-1, ISO 15712-2, ISO 15712-3, ISO 15712-4, ISO 16032, ISO 16283-1, ISO 10052, ISO 17497-1, ISO 17497-2, ISO 18233, ISO 3822-1, ISO 3822-2, ISO 3822-3, ISO 3822-4, ISO 13472-1, ISO 13472-2 |
|
20. |
Vibration and shock mechanical ( vibration and shock in buildings with sensitive equipment, guidelines for measuring vibrations and assessing their impact on buildings, operating parameters for monitoring the health of structures ) |
4 |
ISO 4866, ISO/TS 10811-1, ISO/TS 10811-2, ISO 16587 |
|
21. |
Fire resistance tests of building elements and structures ( insulation at the penetration point, sealants for linear joints, inflatable automatic fire dampers ) |
8 |
ISO 10295-1, ISO 10295-2, ISO/TR 10295-3, ISO 10294-1,ISO 10294-2, ISO 10294-3, ISO 10294-4, ISO 10294-5 |
|
22. |
Plastic piping systems (suitability for system purposes, determination of migration values for plastic pipes, fittings and their connections, vacuum leakage test method, guide to conformity assessment) |
43 |
ISO 4427-1, ISO 4427-2, ISO 4427-3, ISO 4427-5, ISO 8795, ISO 9349, ISO 11298-1, ISO 11298-3, ISO 21004, ISO 21307, ISO 22391-1, ISO 22391-2, ISO 22391-3, ISO 22391-5, ISO/TS 22391-7, ISO 10467, ISO 11296-1, ISO 11296-3, ISO 11296-4, ISO 11296-7, ISO 11297-1, ISO 11297-3, ISO 13260, ISO 13262, ISO 13263, ISO 13264, ISO 13265, ISO 13266, ISO 13267, ISO 13268, ISO 13272, ISO/TS 17902, ISO 18672-1, ISO 21138-1, ISO 21138-2, ISO 21138-3, ISO 24511, ISO 25780, ISO 1452-1, ISO 1452-2, ISO 1452-3, ISO 1452-4, ISO 1452-5 |
|
23. |
Pipes, fittings, valves ( testing method, recommended laying technology, classification and design guide, main dimensions, performance requirements ) |
14 |
ISO 2531, ISO 3114, ISO/TR 4191, ISO 10508, ISO 16422, ISO 265-1, ISO 559, ISO 6594, ISO/TR 7074, ISO 8283-1, ISO 8283-2, ISO 8283-3, ISO 8283-4, ISO/TR 7074 |
|
in 2020 - 542 standards |
|||
|
24. |
Doors, windows, blinds, building fittings and cornices |
149 |
EN 1026, EN 1027, EN 107, EN 1121, EN 1125, EN 1154, EN 1154, EN 1154, EN 1155, EN 1155, EN 1155, EN 1158, EN 1158, EN 1158, EN 1191, EN 1192, EN 12045, EN 12046-1, EN 12046-2, EN 12051, EN 12152, EN 12153, EN 12154, EN 12155, EN 12179, EN 12194, EN 12207, EN 12208, EN 12209: 2016, EN 12210, EN 12211, EN 12216, EN 12217, EN 12219, EN 12320, EN 12365-1, EN 12365-2, EN 12365-3, EN 12365-4, EN 12400, EN 12424, EN 12425, EN 12426, EN 12427, EN 12428, EN 12433-1, EN 12433-2, EN 12444, EN 12453, EN 12489, EN 12519, EN 12604, EN 12635, EN 12833, EN 12835, EN 1294, EN 12978, EN 1303, EN 13049, EN 13050, EN 13051, EN 130, EN 13115, EN 13116, EN 13119, EN 13120, EN 13120, EN 13123-1, EN 13123-2, EN 13124-1, EN 13124-2, EN 13125, EN 13126-10, EN 13126-11, EN 13126-12, EN 13126-13, EN 13126-14, EN 13126-15, EN 13126-16, EN 13126-17, EN 13126-19, EN 13126-1, EN 13126-2, EN 13126-3, EN 13126-4, EN 13126-5, EN 13126-6, EN 13126-7, EN 13126-8, EN 13126-9, EN 13241, EN 13330, EN 13420, EN 13527, EN 13561, EN 13561, EN 13637, EN 13659, EN 13830, EN 14019, EN 14024, EN 14201, EN 14202, EN 14203, EN 14351-1, EN 14351-2, EN 14500, EN 14501, EN 14608, EN 14609, EN 14637, EN 14648, EN 14759, EN 14846, EN 1522, EN 1523, EN 1527, EN 1529, EN 1530, EN 15684, EN 16005, EN 16005, EN 16034, EN 16035, EN 1627, EN 1628, EN 1629, EN 1630, EN 16361, EN 16433, EN 16434, EN 16580, EN 1670, EN 1670, EN 16758, EN 16864, EN 17146, EN 179, EN 1906, EN 1932, EN 1933, EN 1935, EN 1935, EN 947, EN 948, EN 949, EN 950, EN 951, EN 952 |
|
25. |
Cement and building lime |
27 |
EN 13282-1, EN 13282-2, EN 13282-3, EN 13639, EN 14216, EN 14647, EN 14647, EN 15368, EN 15743, EN 16908, EN 196-10, EN 196-11, EN 196-1, EN 196-2, EN 196-3, EN 196-5, EN 196-6, EN 196-7, EN 196-8, EN 196-9, EN 197-1, EN 197-2, EN 413-1, EN 413-2, EN 459-1, EN 459-2, EN 459-3 |
|
26. |
Ceramic tiles |
13 |
EN 12004-1, EN 12004-2, EN 12808-1, EN 12808-2, EN 12808-3, EN 12808-4, EN 12808-4, EN 12808-5, EN 13888, EN 14411, EN 14891 , EN 17160 |
|
27. |
Plastic piping and duct systems |
72 |
EN 1119, EN 1120, EN 12095, EN 12099, EN 12100, EN 12106, EN 12118, EN 12119, EN 12200-1, EN 12201-1, EN 12201-2, EN 12201-3 , EN 12201-4, EN 12201-5, EN 1228, EN 1229, EN 12666-1, EN 1329-1, EN 13476-1, EN 13476-2, EN 13476-3, EN 13598-1, EN 13598-2, EN 1393, EN 1393, EN 1394, EN 1394, EN 1401-1, EN 14364, EN 1447, EN 1451-1, EN 1451-1, EN 1453-1, EN 1453-1, EN 1455-1, EN 14636-1, EN 14636-2, EN 14741, EN 14758-1, EN 14802, EN 14830, EN 14982, EN 15012, EN 15014, EN 15015, EN 1519-1, EN 15383, EN 1555-1, EN 1555-2, EN 1555-3, EN 1555-4, EN 1555-5, EN 1565-1, EN 1566-1, EN 16000, EN 1680, EN 1704, EN 1705, EN 1716, EN 17176-1, EN 17176-2, EN 17176-5, EN 1796, EN 1852-1, EN 1905, EN 637, EN 705, EN 761, EN 802, EN 803, EN 804, EN 917 |
|
28. |
Ventilation for buildings ( technical requirements, control methods, terminology for these types of products are established) |
66 |
EN 12097, EN 12220, EN 12236, EN 12237, EN 12238, EN 12239, EN 12589, EN 12599, EN 12792, EN 13030, EN 13053, EN 13141-10, EN 13141-11, EN 13141-1, EN 13141-2, EN 13141-3, EN 13141-4, EN 13141-5, EN 13141-6, EN 13141-7, EN 13141-8, EN 13141-9, EN 13142, EN 13180, EN 13181, EN 13182, EN 13182, EN 13264, EN 13403, EN 14134, EN 14239, EN 14240, EN 14277, EN 14518, EN 1505, EN 1506, EN 1507, EN 15116, EN 15423, EN 15650, EN 15665, EN 15726, EN 15727, EN 15780, EN 16211, EN 16282-1, EN 16282-2, EN 16282-3, EN 16282-4, EN 16282-5, EN 16282-7, EN 16282-8, EN 16445, EN 16573, EN 16798-13, EN 16798-15, EN 16798-17, EN 16798-1, EN 16798-3, EN 16798-5-1, EN 16798-5-2, EN 16798-7, EN 16798-9, EN 17192, EN 1751, EN 1886 |
|
29. |
Floor screed (properties and requirements, determination of wear resistance and control of other parameters) |
13 |
EN 13318, EN 13813, EN 13892-1, EN 13892-2, EN 13892-3, EN 13892-4, EN 13892-5, EN 13892-6, EN 13892-7, EN 13892-8, EN 13892-9, EN 14016-1, EN 14016-2 |
|
30. |
Anti-seismic devices (requirements, properties of anti-seismic devices) |
1 |
EN 15129 |
|
31. |
Sealants for joints in construction (sealants for facade elements, glazing, pedestrian crossings, sanitary connections) |
7 |
EN 15434, EN 15651-1, EN 15651-2, EN 15651-3, EN 15651-4, EN 15651-4, EN 15651-5 |
|
32. |
Sustainability of construction works (building sustainability assessment, environmental performance assessment framework, economic performance assessment system) |
10 |
EN 15643-1, EN 15643-2, EN 15643-3, EN 15643-4, EN 15643-5, EN 15804, EN 15942, EN 15978, EN 16309, EN 16627 |
|
33. |
Construction products (hazardous substances emission assessment) |
3 |
EN 16516, EN 16687, EN 17087 |
|
34. |
Stretch ceilings (technical requirements and test methods) |
1 |
EN 14716 |
|
35. |
Polymer modified bitumen thick coatings for waterproofing ( definitions, requirements and test methods) |
9 |
EN 15812, EN 15813, EN 15814, EN 15815, EN 15816, EN 15817, EN 15818, EN 15819, EN 15820 |
|
36. |
Flexible sheets for waterproofing (bitumen sheets for roof waterproofing, plastic and rubber sheets for roof waterproofing, determination of stability, flexibility, resistance, adhesion) |
62 |
EN 1107-1, EN 1107-2, EN 1108, EN 1109, EN 1110, EN 12039, EN 12039, EN 12310-1, EN 12310-2, EN 12311-1, EN 12311-2, EN 12316-1, EN 12316-2, EN 12317-1, EN 12317-2, EN 12691, EN 12730, EN 1296, EN 1297, EN 13111, EN 13375, EN 13416, EN 13583, EN 13596, EN 13653, EN 13707, EN 13859-1, EN 13859-2, EN 13897, EN 13948, EN 13956, EN 13967, EN 13969, EN 13969, EN 13970, EN 13970, EN 13984, EN 14223, EN 14224, EN 14691, EN 14692, EN 14693, EN 14694, EN 14695, EN 14909, EN 14967, EN 1548, EN 15976, EN 16002, EN 17190, EN 1844, EN 1847, EN 1848-1, EN 1848-2, EN 1849-1, EN 1849-2, EN 1850-1, EN 1850-2, EN 1928, EN 1931, EN 1931, EN 495-5 |
|
37. |
Precast concrete products (hollow core slabs, masts and piers, foundation piles, terrazzo tiles, test method for glass fibre reinforced cement) |
48 |
EN 1168, EN 1169, EN 1170-1, EN 1170-2, EN 1170-3, EN 1170-4, EN 1170-5, EN 1170-6, EN 1170-7, EN 1170-8, EN 12737, EN 12794, EN 12794, EN 12839, EN 12843, EN 13198, EN 13224, EN 13225, EN 13369, EN 13693, EN 13747, EN 13748-1, EN 13748-1, EN 13748-1, EN 13748-2, EN 13978-1, EN 14474, EN 14649, EN 14650, EN 14651, EN 14721, EN 14843, EN 14844, EN 14991, EN 14992, EN 15037-1, EN 15037-2, EN 15037-3, EN 15037-4, EN 15037-5, EN 15050, EN 15191, EN 15258, EN 15422, EN 15435, EN 15498, EN 15564, EN 16757 |
|
38. |
Plumbing (kitchen sinks, wall-mounted urinals, toilet and urine flushing tanks, sanitary fixtures) |
30 |
EN 12764, EN 13310, EN 13407, EN 13558, EN 13559, EN 14055, EN 14296, EN 14428, EN 14516, EN 14527, EN 14528, EN 14688, EN 15200, EN 15200, EN 15334, EN 15636, EN 15719, EN 15720, EN 16578, EN 198, EN 232, EN 249, EN 251, EN 263, EN 31, EN 33, EN 35, EN 695, EN 80, EN 997 |
|
39. |
Chimneys (chimney terminals, metal chimneys, clay chimneys, ceramic external chimneys, walls for system chimneys) |
31 |
EN 12446, EN 13063, EN 13063-2, EN 13063-3, EN 13069, EN 13216-1, EN 13384-1, EN 13384-2, EN 13384-3, EN 13502, EN 14241-1, EN 14297, EN 1443, EN 14471, EN 1457-1, EN 1457-2, EN 14989-1, EN 14989-2, EN 15287-1, EN 15287-2, EN 16475-2, EN 16475-3, EN 16475-7, EN 16497-1, EN 16497-2, EN 1806, EN 1856-1, EN 1856-2, EN 1857, EN 1858, EN 1859. |
|
in 2021 - 505 standards |
|||
|
40. |
Precast concrete elements made of autoclaved aerated concrete or lightweight aggregate with an open structure ( precast concrete elements made of autoclaved aerated concrete, determination of moisture content in autoclaved aerated concrete, precast concrete elements made of lightweight aggregate made of open-structure concrete with structural or non-structural reinforcement, determination of frost resistance of autoclaved aerated concrete, determination of dry density of lightweight aggregate made of open-structure concrete ) |
26 |
EN 12269-1, EN 12269-2, EN 12602, EN 1351, EN 1352, EN 1353, EN 1354, EN 1355, EN 1356, EN 1520, EN 1521, EN 15304, EN 15361, EN 1737, EN 1738, EN 1739, EN 1740, EN 1741, EN 1742, EN 678, EN 679, EN 680, EN 989, EN 990, EN 991, EN 992. |
|
41. |
Paving stones and curbs (concrete paving flags, concrete curb blocks, natural stone slabs for external paving, natural stone paving for external paving, natural stone curbs for external paving ) |
11 |
EN 1338, EN 1338, EN 1339, EN 1339, EN 1340, EN 1340, EN 1341, EN 1342, EN 1343, EN 1344, EN 1344 |
|
42. |
Thermal insulation materials and products |
97 |
EN 12085, EN 12086, EN 12087, EN 12088, EN 12089, EN 12090, EN 12091, EN 12429, EN 12430, EN 12431, EN 13162, EN 13163, EN 1 3164, EN 13165, EN 13166, EN 13167, EN 13168, EN 13169, EN 13170, EN 13171, EN 13172, EN 13467, EN 13468, EN 13469, EN 13470, EN EN 13471, EN 13472, EN 13494, EN 13495, EN 13496, EN 13497, EN 13498, EN 13499, EN 13500, EN 13793, EN 13820, EN 14063-1, EN 14063-1, EN 14063-2, EN 14064-1, EN 14064-2, EN 14303, EN 14304, EN 14305, EN 14306, EN 14307, EN 14308, EN 14309, EN 14313, EN 14314, EN 14315-1, EN 14315-2, EN 14316-1, EN 14316-2, EN EN 14317-1, EN 14317-2, EN 14318-1, EN 14318-2, EN 14319-1, EN 14319-2, EN 14320-1, EN 14320-2, EN 14706, EN 14707, EN 14933, EN 14934, EN 15101-1, EN 15101-2, EN 15501, EN 15599-1, EN 15599-2, EN 15600-1, EN 15600-2, EN 15715, EN 15732, EN 16025-1, EN 16025-2, EN 1602, EN 1603, EN 1604, EN 1605, EN 16069, EN 1606, EN 1607, EN 1608, EN 609, EN 16382, EN 16383, EN 16724, EN 16783, EN 16809-2, EN 17101, EN 822, EN 823, EN 824, EN 825, EN 826 |
|
43. |
Concrete and related products |
158 |
EN 1008, EN 12188, EN 12189, EN 12190, EN 12192-1, EN 12192-2, EN 12350-10, EN 12350-11, EN 12350-12, EN 12350-1, EN 12350-2 , EN 12350-3, EN 12350-4, EN 12350-5, EN 12350-6, EN 12350-7, EN 12350-8, EN 12350-9, EN 12390-10, EN 12390-11, EN 12390-13, EN 12390-14, EN 12390-1, EN 12390-2, EN 12390-3, EN 12390-3, EN 12390-4, EN 12390-5, EN 12390-6, EN 12390-7, EN 12390-8, EN 12504-1, EN 12504-2, EN 12504-3, EN 12504-4, EN 12614, EN 12615, EN 12617-1, EN 12617-2, EN 12617-3, EN 2617-4, EN 12618-1, EN 12618-2, EN 12618-3, EN 12636, EN 12637-1, EN 12637-3, EN 13057, EN 13062, EN 13263-1, EN 3263-2, EN 13294, EN 13295, EN 13395-1, EN 13395-2, EN 13395-3,EN 13395-4, EN 13396, EN 13412, EN 13529, EN 13577, EN 13578, EN 13579, EN 13580, EN 13581, EN 13584, EN 13670, EN 13687-1, EN 13687-2, EN 13687-3, EN 13687-4, EN 13687-5, EN 13733, EN 13791, EN 13894-1, EN 13894-2, EN 14068, EN 14117, EN 14406, EN 14487-1, EN 14487-2, EN 14488-1, EN 14488-2, EN 14488-3, EN 14488-4, EN 14488-5, EN 14488-6, EN 14488-7, EN 14497, EN 14497, EN 14498, EN 14629, EN 14630, EN 14845-1, EN 14845-2, EN 14889-1, EN 14889-2, EN 1504-10, EN 1504-1, EN 1504-2, EN 1504-3, EN 1504-4, EN 1504-5, EN 1504-6, EN 1504-7, EN 1504-8, EN 1504-9, EN 15167-1, EN 15167-2, EN 15183, EN 15184, EN 1542, EN 1543, EN 1544, EN 16502, EN 16622, EN 1766, EN 1767, EN 1770, EN 1771, EN 1771, , EN 1799, EN 1877-1, EN 1877-2, EN 1881, EN 206, EN 445, EN 446, EN 447, EN 450-1, EN 450-2, EN 451-1, EN 451-2, EN 480-10, EN 480-11, EN 480-12, EN 480-13, EN 480-14, EN 480-15, EN 480-1, EN 480-2, EN 480-4, EN 480-5, EN 480-6, EN 480-8, EN 523, EN 524-1, EN 524-2, EN 524-3, EN 524-4, EN 524-5, EN 524-6, EN 934-1, EN 934-2, EN 934-3, EN 934-4, EN 934-5, EN 934-6 |
|
44. |
Prefabricated central heating and central cooling systems ( central heating pipes , insulated piping systems with direct and connections for hot water networks under direct layer. steel valve assembly for steel service pipes, polyurethane insulation and polyethylene outer sheath) |
12 |
EN 13941-1, EN 13941-2, EN 14419, EN 15632-1, EN 15632-2, EN 15632-3, EN 15632-4, EN 15698-1, EN 15698-2, EN 253, EN 448, EN 489 |
|
45. |
Roofing materials for intermittent installation and wall cladding products (solar energy systems for roofs, general requirements for intermittent roofing, clay roofing tiles for intermittent installation) |
40 |
EN 1013, EN 1024, EN 12326-1, EN 12326-2, EN 12467, EN 12951, EN 1304, EN 14437, EN 14509, EN 1462, EN 14782, EN 14783, EN 14963, EN 14964, EN 15057, EN 16153, EN 16240, EN 1873,EN 490, EN 491, EN 492, EN 494, EN 501, EN 502, EN 504, EN 505, EN 506, EN 507, EN 508-1, EN 508-2, EN 508-3, EN 516, EN 517, EN 534, EN 538, EN 539-1, EN 539-2, EN 544, EN 607, EN 612, |
|
46. |
Glass in construction ( Silver coated float glass mirrors for interior use, safety glazing, double glazing. General information, system description, replacement rules, tolerances and visual quality ) |
144 |
EN 1036-1, EN 1036-2,EN 1051-1, EN 1051-2, EN 1063, EN 1096-1, EN 1096-2, EN 1096-3, EN 1096-4, EN 1096-5, EN 12150-1, EN 12150-2, EN 12337-1, EN 12337-2, EN 12488, EN 12600, EN 12603, EN 12758, EN 1279-1, EN 1279-2, EN 1279-3, EN 1279-4, EN 1279-5, EN 1279-6, EN 1288-1, EN 1288-2, EN 1288-3, EN 1288-4, EN 1288-5, EN 12898, EN 13022-1, EN 13022-2, EN 13024-1, EN 13024-2, EN 13541, EN 14178-1, EN 14178-2, EN 14179-1, EN 14179-2, EN 14321-1, EN 14321-2, EN 14449,EN 14449, EN 15681-1, EN 15681-2, EN 15682-1, EN 15682-2, EN 15683-1, EN 15683-2, EN EN 15752-1, EN 15755-1, EN 15998, EN 16477-1, EN 1748-1-1, EN 1748-1-2, EN 1748-2-1, EN 1748-2-2, EN 1863-1, EN 1863-2, EN 356, EN 410, EN 572-1, EN 572-2, EN 572-3, EN 572-4, EN 572-5, EN 572-6, EN 572-7, EN 572-8, EN 572-9, EN 673, EN 674, EN 675, EN 1036-1, EN 1036-2, EN 1051-1, EN 1051-2, EN 1063, EN 1096-1, EN 1096-2, EN 1096-3, EN 1096-4, EN 1096-5, EN 12150-1, EN 12150-2, EN 12337-1, EN 12337-2, EN 12488, EN 12600, EN 12603, EN 12758, EN 1279-1, EN 1279-2, EN 1279-3, EN 1279-4, EN 1279-5, EN 1279-6, EN 1288-1, EN 1288-2, EN 1288-3, EN 1288-4, EN 1288-5, EN 12898, EN 13022-1, EN 13022-2, EN 13024-1, EN 13024-2, EN 13541, EN 14178-1, EN 14178-2, EN 14179-1, EN 14179-2, EN 14321-1, EN 14321-2, EN 14449, EN 14449, EN 15681-1, EN 15681-2, EN 15682-1, EN 15682-2, EN 15683-1, EN 15683-2, EN 15752-1, EN 15755-1, EN 15998, EN 16477-1, EN 1748-1-1, EN 1748-1-2, EN 1748-2-1, EN 1748-2-2, EN 1863-1, EN 1863-2, EN 356, EN 410, EN 572-1, EN 572-2, EN 572-3, EN 572-4, EN 572-5, EN 572-8, EN 572-9, EN 673, EN 674, EN 675 |
|
47. |
Thermal performance of buildings and building components (energy performance of buildings, thermal performance of building materials and components, air permeability of building components and building elements) |
17 |
EN 12114, EN 12412-2, EN 12412-4, EN 12664, EN 12667, EN 12865, EN 12939, EN 13009, EN 13187, EN 15026, EN 16012, EN 1934, EN 1946-1, EN 1946-2, EN 1946-3, EN 1946-4, EN 1946-5 |
|
Direction of research work |
Implementation mechanism |
Implementation period |
Responsible persons |
|
|
1. |
Development of technologies for the production of MDF boards from local alternative wood raw materials. |
1. Allocation of financial resources for research and development work on the development of new raw materials for the production of MDF from alternative wood material based on the results of a competitive selection. |
until August 1, |
Mini-innovations ( I. Abdurakhmanov ) |
|
2. Obtaining new types of raw materials to replace wood in the production of MDF and studying their basic properties. |
until January 1st 2020 |
Mini-innovations ( I. Abdurakhmanov ), Ministry of Construction (B. Zakirov), Association "Uzpromstroymaterialy" |
||
|
3. Conducting testing of a prototype MDF made from alternative wood raw materials and summarizing the results. |
until March 1st 2020 |
Ministry of Construction (B. Zakirov), Agency "Uzstandard" ( I. Abdurakhmanov ) |
||
|
4. Development of technologies for the production of MDF from alternative wood raw materials. Preparation of technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until August 1 2020 |
Mini-innovations ( I. Abdurakhmanov ), Agency "Uzstandard" (D. Sattarov), Association "Uzpromstroymaterialy" |
||
|
2. |
Conducting research and development work on the development of technologies for the production of energy-efficient polystyrene concrete wall blocks based on the secondary production of polystyrene product waste. |
1. Allocation of financial resources for the development of technologies for the production of energy-efficient polystyrene concrete wall blocks based on the secondary production of polystyrene product waste and based on the results of a competitive selection. |
until August 1, |
Mini-innovations ( I. Abdurakhmanov ) |
|
2. Production of a prototype of an energy-efficient polystyrene concrete wall block based on the secondary production of polystyrene product waste for testing purposes. |
until January 1st 2020 |
Mini-innovations ( I. Abdurakhmanov ), Ministry of Construction (B. Zakirov), Association "Uzpromstroymaterialy" |
||
|
3. Conducting test work on energy-efficient polystyrene concrete wall blocks in the production of building materials and summarizing the results. |
until March 1st 2020 |
Agency "Uzstandard" (D. Sattarov), Mini-innovations ( I. Abdurakhmanov ) |
||
|
4. Development of technologies for the production of energy-efficient polystyrene concrete wall blocks. Preparation of technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until August 1 2020 |
Mini-innovations ( I. Abdurakhmanov ), Uzstandard Agency Association "Uzpromstroymaterialy" |
||
|
3. |
Production of modified sulfur concrete based on local raw materials for use in road construction. |
1. Announcement of a competition of scientific and technical projects on the topic of “Development of production of modified sulfur concrete based on local raw materials” and allocation of financial resources based on the results of the competitive selection. |
until September 1, |
Mini-innovations ( I. Abdurakhmanov ) |
|
2. Production of a prototype of modified sulfur concrete for testing purposes. |
until March 1, 2020 |
Mini-innovations ( I. Abdurakhmanov ), Khimprom |
||
|
3. Construction of a 1 km long experimental section of a road using sulfur concrete. |
until June 1, |
Ministry of Transport (A. Ramatov), Mini-innovations ( I. Abdurakhmanov ) |
||
|
4. Conducting test work on an experimental section of the highway and summarizing the results. 5. Study of the impact of using sulfur concrete in the construction of highways on the environment. |
until February 1, 2021 |
Mini-innovations ( I. Abdurakhmanov ), Uzstandard Agency |
||
|
6. Development of technologies for the production of sulfur concrete. Preparation of technical documents with the receipt of the necessary patent. 7. Development and submission to the Cabinet of Ministers of the Republic of Uzbekistan of a program for the construction of highways using sulfur concrete until 2025. |
until April 1, 2021 |
Mini-innovations ( I. Abdurakhmanov ), Agency "Uzstandard" (D. Sattarov), |
||
|
4. |
Development of technologies for the production of lightweight thermal insulation boards from local raw materials for covering and roofing buildings. |
1. Allocation of financial resources for the development of technologies for the production of lightweight thermal insulation boards from local raw materials for covering and roofing houses based on the results of a competitive selection. |
until September 1, |
Mini-innovations ( I. Abdurakhmanov ) |
|
2. Development of compositions of lightweight thermal insulation boards from local raw materials for covering and roofing houses and production of a prototype for testing. |
until March 1, 2020 |
Mini-innovations ( I. Abdurakhmanov ), Ministry of Construction (B. Zakirov), Association "Uzpromstroymaterialy" |
||
|
3. Conducting test work on lightweight thermal insulation boards made from local raw materials in construction and summarizing the results. |
until June 1, |
Ministry of Construction (B. Zakirov), |
||
|
4. Development of technologies for the production of lightweight thermal insulation boards from local raw materials for covering and roofing buildings. Preparation of technical documents with obtaining the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until August 1, 2021 |
Ministry of Innovations Uzstandard Agency Association "Uzpromstroymaterialy" |
||
|
5. |
Production of new types of dry building mixtures from polystyrene concrete. |
1. Allocation of financial resources for a scientific and technical project |
until October 1, 2019 |
Ministry of Innovations |
|
2. Obtaining compositions of new types of dry building mixtures made of polystyrene concrete from local raw materials. |
until March 1, |
Ministry of Innovation Ministry of Construction (B. Zakirov), Association "Uzpromstroymaterialy" |
||
|
3. Conducting test work in the construction of new types of dry building mixtures made of polystyrene concrete and generalization of the results. |
until July 1, |
Ministry of Construction (B. Zakirov), |
||
|
4. Development of technologies for the production of a new type of dry building mix from polystyrene concrete. Preparation of technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until September 1, |
Ministry of Innovations Uzstandard Agency Association "Uzpromstroymaterialy" |
||
|
6. |
Development of technologies for the production of high-quality cement clinker from natural and secondary resources. |
1. Allocation of financial resources for the development of technologies for the production of high-quality cement clinker from natural and secondary resources based on the results of a competitive selection. |
until October 1, |
Ministry of Innovations |
|
2. Development of compositions and production of cement clinker from natural and secondary resources for experimental testing. |
until March 1, |
Ministry of Innovation Ministry of Construction (B. Zakirov), Association "Uzpromstroymaterialy" |
||
|
3. Conducting test work on cement clinker from natural and secondary resources in the production of building materials and generalization of the results. |
until July 1st 2020 |
Ministry of Construction (B. Zakirov), |
||
|
4. Development of technologies for the production of clinker cement from natural and secondary resources. Preparation of technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until September 1st 2020 |
Ministry of Innovations Agency "Uzstandard" |
||
|
7. |
Development of technologies for the production of polyvinyl chloride (PVC) products based on local raw materials and implementation into production practice. |
1. Announcement of a competition of scientific and technical projects for the development of new types of PVC building materials based on local raw materials and the allocation of financial resources based on the results of the competitive selection. |
until November 1, 2019 |
Ministry of Innovations |
|
2. Obtaining new types of building materials from PVC based on local raw materials and studying their basic properties. |
until April 1, |
Ministry of Innovation Khimprom (O. Temirov), |
||
|
3. Conducting testing of a prototype of PVC building material in construction and summarizing the results. |
until July 1, |
Ministry of Construction (B. Zakirov), Uzstandard Agency |
||
|
4. Development of technologies for the production of PVC building materials. Preparation of technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until September 1, |
Ministry of Innovations (B. Sagdullaev), Agency "Uzstandard" (D. Sattarov), |
||
|
8. |
Development of technologies for the production of building products for passive alternative lighting based on polymer compounds. |
1. Announcement of a competition of scientific and technical projects for the development of technologies for the production of passive alternative lighting building products based on polymer compounds and the allocation of financial resources based on the results of the competitive selection. |
until November 1, |
Ministry of Innovations |
|
2. Development of compositions of a construction product for passive alternative lighting based on polymer compounds from local raw materials. |
until May 1, |
Ministry of Innovation Ministry of Construction (B. Zakirov), Association "Uzpromstroymaterialy" |
||
|
3. Conducting testing of passive alternative lighting products based on polymer compounds and summarizing the results. |
until August 1, |
Ministry of Construction (B. Zakirov), |
||
|
4. Development of technologies for the production of building products for passive alternative lighting based on polymer compounds. Preparation of technical documents with obtaining the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until October 1st 2020 |
Ministry of Innovations Agency "Uzstandard" |
||
|
9. |
Development of technologies for the production of building materials based on basalt (reinforcement, thermal insulation materials, etc.) for the construction of high-rise buildings. |
1. Announcement of a competition of scientific and technical projects for the development of technologies for building materials based on basalt (reinforcement, thermal insulation materials, etc.) for the construction of high-rise buildings and the allocation of financial resources based on the results of the competitive selection. |
until November 1, |
Ministry of Innovations |
|
2. Development of compositions and production of a prototype of a construction product based on basalt (reinforcement, thermal insulation materials, etc.) for testing purposes. |
until May 1, |
Ministry of Innovations |
||
|
3. Conducting testing of a basalt-based construction product and summarizing the results. |
until August 1, |
Ministry of Construction (B. Zakirov), |
||
|
4. Development of technologies for the production of building materials based on basalt. Preparation of reports and technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until October 1st 2020 |
Ministry of Innovations |
||
|
10. |
Production of building materials from ash and slag and other types of local man-made waste. |
1. Allocation of financial resources for research and development work on the production of building materials from ash and slag and other types of man-made waste based on the results of a competitive selection. |
until December 1, |
Ministry of Innovations |
|
2. Development and production of a prototype of a building material from ash and slag and other types of local man-made waste for testing purposes. |
until June 1, 2020 |
Ministry of Innovations |
||
|
3. Conducting testing of building materials from ash and slag and other types of local man-made waste and summarizing the results. |
until September 1, |
Uzstandard Agency |
||
|
4. Development of technologies for the production of building materials from ash and slag and other types of local man-made waste. Preparation of technical documents with the receipt of the necessary patent. 5. Commercialization and implementation into production of the result of a scientific achievement. |
until November 1, |